ProgressivEdge
Take Action... Get Results
Newsletter
YouTube LinkedIn
Newsletter Newsletter

Glossary

Symbols & Numbers
A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z

O

OCC

Occurrence – as defined in the FMEA

OEE

Overall Equipment Effectiveness -  OEE = (% Available) x (% of designed output rate) x (% First Pass Yield)

OFAT

One Factor at A Time – holding all factors constant while one factor is changed to see its effect on the output.  This is the lowest level (less efficient) means of DOE.

One-piece flow

See Continuous Flow Production

Operating Expenses

The money required the system to convert inventory into throughput

Operational Planning

Tactical details for short-term tied into Strategic Plans

Overproduction

One of the 8 wastes.  Producing more, sooner or faster than is required by the next process.

 

Home | About Us | Services | Methods | Free Tools | Calendar | Contact Us
Clients | Books & Articles | On-Site Training | Booking | Public Seminars | Newsletter | Links 

© Copyright 2007-2012, all rights reserved

Privacy Policy/Terms of Use

Site Map

web design by CMF Web Works

 

ProgressivEdge, Inc.
27475 Ynez Road, #372
Temecula, CA 92591
619.244.8705